Q1 50M Compulsory solve Probability, sampling, quality control, maintenance decision, e-governance
(a) A train is scheduled to arrive at a station at a random time between 09:00 AM and 09:30 AM. The actual arrival time is equally likely to be any moment within this interval.
(i) Define a suitable probability density function (PDF).
(ii) What is the probability that the train will arrive before 09:13 AM ?
(iii) Find the expected arrival time and the variance of the arrival time.
(iv) Given that the train has not arrived by 09:11 AM, what is the expected arrival time ?
10
(b) Determine the required sample size for estimating the true weight cereal container from a population of N = 5000.
Based on the past records variance of weight is 121 grams and this estimate should be within 2·5 grams of the true average weight with 99% confidence.
Will there be a change in the size of the sample if we assume population to be infinite ? If so, explain by how much ? (Table enclosed)
10
(c) A manufacturing facility specializing in Sheet Metal Production has implemented a Statistical Quality Control Program to monitor and improve process performance. As a part of this initiative, an Engineer has recorded the number of visible surface defects identified on 20 sequential metal sheets, each representing one production unit. The data collected during this inspection phase are given below :
[Table with Sheet No. 1-20 and Defect Counts: 5, 6, 4, 4, 6, 7, 0, 6, 5, 3, 1, 4, 5, 3, 6, 4, 3, 1, 3, 4]
Using the above information :
(i) Determine the Center line (CL), Upper control limit (UCL) and Lower control limit (LCL).
(ii) Plot the appropriate Control Chart and interpret the result.
10
(d) A Tech Solutions is a mid-sized IT consulting company specializing in automated HR and payroll systems for small business. The company has successfully digitized most of its operations, relying heavily on its internal computer systems for payroll processing and report generations. However, despite its automation efforts, the computer system has experienced periodic failures. Over the past 20 months, the computer system has broken down as indicated in the table below :
Each breakdown results in an average loss of ₹4500/- due to time delay and technical service expenses. As a preventive measure, company is considering a monthly service contract for preventive maintenance. If they sign up for the contract, the average number of breakdowns is expected to decrease to 1 per month, and the contract would cost ₹3300/- per month.
Based on the given information, advise that the company should go for contract for preventive maintenance or not ?
10
(e) Critically analyse the advantages of E Governance for Government, Public and Business giving suitable examples.
10
हिंदी में पढ़ें
(a) एक ट्रेन 09:00 AM से 09:30 AM के बीच यादृच्छिक समय पर एक स्टेशन पर आने वाली है । वास्तविक आगमन समय इस अंतराल के भीतर किसी भी क्षण होने की समान संभावना है ।
(i) उचित संभाव्यता घनत्व फलन (पीडीएफ) परिभाषित कीजिए ।
(ii) 09:13 AM के पहले ट्रेन के आने की क्या संभावना है ?
(iii) अपेक्षित आगमन समय और आगमन समय का अंतर बताइए ।
(iv) यह देखते हुए कि ट्रेन 09:11 AM तक नहीं आई है, अपेक्षित आगमन का समय क्या है ?
10
(b) N = 5000 आबादी में से अनाज के कंटेनर का सटीक वजन जानने के लिए आवश्यक नमूना आकार निर्धारित कीजिए ।
पिछले रिकॉर्ड पर आधारित वजन का परिवर्तन 121 ग्राम है । यह आकलन सही औसत वजन के 2·5 ग्राम के अंदर 99% भरोसे के साथ होना चाहिए ।
अगर हम अनंत आबादी मान लें, तो क्या नमूने के आकार में परिवर्तन होगा ? अगर हाँ, तो कितना होगा, समझाइए । (सारणी संलग्न है)
10
(c) शीट मेटल उत्पादन में विशेषता वाली विनिर्माण सुविधा ने प्रक्रिया प्रदर्शन को अनुश्रवण एवं सुधार के लिए सांख्यिकी गुण नियंत्रण कार्यक्रम अमल किया है। इस पहल के एक हिस्से के रूप में एक अभियंता ने, 20 अनुक्रमिक धातु शीट जो कि प्रत्येक एक उत्पादन इकाई का प्रतिनिधित्व करता है, दृश्यमान सतह दोषों की संख्या दर्ज की है। निरीक्षण के दौरान एकत्र किए गए आँकड़े नीचे दिए गए हैं :
[Table with Sheet No. 1-20 and Defect Counts: 5, 6, 4, 4, 6, 7, 0, 6, 5, 3, 1, 4, 5, 3, 6, 4, 3, 1, 3, 4]
उपर्युक्त जानकारी का उपयोग करते हुए :
(i) केन्द्र रेखा (सीएल), ऊपरी नियंत्रण सीमा (यूसीएल) और निचली नियंत्रण सीमा (एलसीएल) का निर्धारण कीजिए।
(ii) उपयुक्त नियंत्रण चार्ट अंकित कीजिए और परिणाम की व्याख्या कीजिए।
10
(d) A Tech Solutions एक मध्यम आकार की आई टी परामर्श फर्म है जो लघु व्यापार के लिए मानव संसाधन एवं वेतन प्रणालियों में विशेषज्ञता रखती है। कंपनी ने अपने परिचालन में अपने आंतरिक कंप्यूटर सिस्टम पर बहुत अधिक निर्भर करते हुए वेतन भुगतान की प्रक्रिया और रिपोर्ट बनाने का सफलता पूर्वक डिजिटलीकरण कर लिया है। तथापि इसके स्वचालन प्रयासों के बावजूद कंप्यूटर सिस्टम को समय-समय पर विफलताओं का अनुभव हुआ है। पिछले 20 महीनों में नीचे दिए तालिका में बताए गए आंकड़ों के अनुसार कंप्यूटर सिस्टम खराब हुआ है :
हर व्यवधान समय में देरी और तकनीकी खर्च के कारण औसतन ₹4500/- नुकसान होता है। कंपनी निवारक उपाय के रूप में निवारक रखरखाव के लिए मासिक सेवा अनुबंध पर विचार कर रही है। अगर कंपनी अनुबंध पर हस्ताक्षर करे तो व्यवधान की औसत संख्या एक हर महीने होने की उम्मीद है और अनुबंध का खर्च ₹3300/- हर महीने होगा।
दी गई जानकारी के आधार पर सलाह दीजिए कि कंपनी को इस निवारक रखरखाव के लिए अनुबंध करना चाहिए या नहीं ?
10
(e) सरकार, जनता और व्यापार में ई गवर्नेंस के लाभों का उपयुक्त उदाहरण देते हुए आलोचनात्मक विश्लेषण कीजिए ।
10
Answer approach & key points
Framework: Statistical Quality Control (SQC) and Operations Research. (a) calculate: given > formula > substitution > result with units > interpretation | (b) calculate: given > formula > substitution > result with units > interpretation | (c) calculate: given > formula > substitution > result with units > interpretation | (d) evaluate: criteria > evidence > balanced judgment | (e) analyse: intro > causes > effects > stakeholders/linkages > way forward Full marks: Accurate calculations with clear steps; logical interpretation of data; well-structured analysis with specific examples.
- PDF f(x) = 1/30 on [0,30]; validity stated
- P(X<13) = 13/30 ≈ 0.4333
- E[X] = 09:15 AM; Var = 75 min²; SD = 5√3 ≈ 8.66 min
- Conditional on X>11: uniform [11,30] → E = 20.5 min = 09:20:30 AM
- Finite population formula n = Nz²σ²/[(N−1)E² + z²σ²] with z = 2.58, σ² = 121, E = 2.5
- n ≈ 125.65 → 126 containers
- Infinite: n₀ = z²σ²/E² ≈ 128.87 → 129 containers
- Increase of 3 (~2.38%); FPC rationale
Q2 50M solve Trend analysis, hypothesis testing, linear programming
(a) The electrical power demand of TATA Power Corporation from 2018 to 2024, measured in megawatts, is provided below. Using the data, forecast the demand for the year 2025 by fitting and plotting the linear trend line.
Year | Electrical Power Demand (Megawatts)
2018 | 94
2019 | 99
2020 | 100
2021 | 110
2022 | 125
2023 | 162
2024 | 142
15
(b) In a study to evaluate the effectiveness of two different animal feeds, researchers recorded the weight gains (in kilograms) of animals after fed each type of feed.
Feed A | 45 | 48 | 47 | 50 | 46 | 49 | 47 | 48
Feed B | 51 | 53 | 52 | 55 | 50 | 52 | 54 | 33
(i) If the two samples are considered independent, can we conclude that Feed B is more effective than Feed A at the 0·025 level of significance ?
(ii) Also examine the case if the same set of eight animals received both feeds, and test at the 0·01 level of significance. (Table enclosed)
15
(c) Techline Pvt. Ltd. is a consumer electrics manufacturing concern producing three models of Smart Devices : X, Y and Z. The company operates under the constraints of two key resources, viz. raw materials and labor hours. Each week, the availability of raw materials is restricted to 800 kg, while labor availability is limited to 600 hours. To maximize profit, the company needs to decide, how many units of each product to manufacture weekly without exceeding the available resources. The relevant details for each product are provided below :
| Product | Raw Material per unit (Kg) | Labor Hours per unit (Hours) | Profit contribution per unit (₹) |
|---------|---------------------------|------------------------------|----------------------------------|
| X | 6 | 5 | 80 |
| Y | 4 | 4 | 60 |
| Z | 2 | 3 | 40 |
(i) Formulate this scenario as a Linear Programming Problem (LPP), and solve it for optimal product mix.
(ii) Based on the optimal solution, analyze the situation if the company wants to introduce a New product W, requiring 2 kg of raw materials and 2 hours of labor hours per unit. Its estimated profit contribution is ₹35/- per unit.
Should the company include this new product in its production mix ?
20
हिंदी में पढ़ें
(a) टाटा पावर कॉरपोरेशन के 2018-2024 तक मेगावाट में मापी गई विद्युत शक्ति की मांग नीचे दी गई है :
वर्ष | विद्युत शक्ति की मांग (Megawatts)
2018 | 94
2019 | 99
2020 | 100
2021 | 110
2022 | 125
2023 | 162
2024 | 142
इस डाटा का उपयोग करते हुए फिटिंग व प्लॉटिंग से रैखिक प्रवृत्ति रेखा द्वारा वर्ष 2025 के लिए मांग का पूर्वानुमान लगाइए ।
15
(b) शोधकर्ताओं ने पशु आहारों के दो प्रकार की प्रभावशीलता का मूल्यांकन करने के लिए एक अध्ययन में पशुओं की प्रत्येक प्रकार के चारे को खिलाने के बाद भार (किलोग्राम में) बढ़ने का रिकॉर्ड किया ।
चारा A | 45 | 48 | 47 | 50 | 46 | 49 | 47 | 48
चारा B | 51 | 53 | 52 | 55 | 50 | 52 | 54 | 33
(i) अगर हम दोनों नमूनों को स्वतंत्र मानते हैं तो क्या हम यह निष्कर्ष निकाल सकते हैं कि महत्व स्तर 0·025 पर चारा B चारा A से अधिक प्रभावी है ?
(ii) आठ जानवरों का वही समूह दोनों चारों को प्राप्त करते है तो 0·01 महत्व स्तर पर इस मामले की भी जाँच कीजिए । (सारणी संलग्न है)
15
(c) Techline Pvt. Ltd. एक इलेक्ट्रिक उपभोक्ता उत्पाद कर्ता है जो X, Y और Z तीन स्मार्ट उपकरण मॉडल बनाती है । कंपनी कच्चे माल व काम के घंटों, दो महत्वपूर्ण संसाधनों की बाधाओं के तहत कार्य करती है । प्रत्येक सप्ताह कच्चे माल की उपलब्धता 800 kg तक सीमित है जबकि श्रमिक उपलब्धता 600 hours तक सीमित है । लाभ को अधिकतम करने के लिए, उपलब्ध संसाधनों को पार किए बिना प्रत्येक उत्पाद की साप्ताहिक कितनी इकाइयाँ बनाती है, का निर्णय कंपनी को लेना है । प्रत्येक उत्पाद के प्रासंगिक विवरण नीचे दिए गए हैं ।
उत्पाद | प्रति यूनिट कच्चा माल (Kg) | प्रति यूनिट श्रम (घंटे) | प्रति यूनिट लाभ योगदान (रुपये)
X | 6 | 5 | 80
Y | 4 | 4 | 60
Z | 2 | 3 | 40
(i) रैखिक प्रोग्रामिंग समस्या (एल पी पी) द्वारा इष्टतम उत्पाद मिश्रण के लिए परिदृश्य तैयार कीजिए ।
(ii) अगर कंपनी एक नए उत्पाद W, जो प्रति यूनिट 2 kg कच्चा माल व दो श्रम घंटे चाहता है, को लाना चाहती है तो सर्वोत्तम संभव समाधान के आधार पर विश्लेषण कीजिए। इसका अनुमानित प्रति यूनिट मुनाफा ₹35/- है।
क्या कंपनी को इस नए उत्पाद को अपने उत्पादन मिश्रण में लाना चाहिए ?
20
Answer approach & key points
Framework: null. (a) calculate: given > formula > substitution > result with units > interpretation | (b) examine: intro > how/why with reasoning > evidence > conclusion | (c) analyse: intro > causes > effects > stakeholders/linkages > way forward Full marks: Accurate calculations, clear reasoning, and complete analysis for all parts.
- x = year − 2021 coding; Σx = 0, Σy = 832, Σxy = 295, Σx² = 28
- Trend y = 118.8571 + 10.5357(year − 2021)
- Forecast 2025 (x=4): 161 MW
- Plot of data points and fitted line (figure provided); linearity assumption noted
- Independent two-sample t-test: pooled s_p² = 183/7 ≈ 26.14; SE = 2.5565
- t = 0.978 < t-critical 2.145 (df 14, 0.025 one-tailed) → fail to reject
- Paired test: d̄ = 2.5; s_d² = 51.43; SE = 2.5355; t = 0.986 < 2.998 (df 7, 0.01) → fail to reject
- Correct interpretation at both levels
Q3 50M calculate Inventory, Aggregate Planning, Project Management
(a) A company has an annual demand of 1600 units for an item, whose unit cost is ₹70/-. The annual holding cost comprises 18% for interest charges, 1% for insurance, 1.5% allowances for obsolescence of unit cost and ₹2.50 for building overheads, ₹3.40 for damage loss, and ₹7.0 miscellaneous costs. Placing each order costs the company ₹100/-.
(i) Calculate Economic Order Quantity (EOQ) and the total costs of stocking the units.
(ii) If the supplier of the items will only deliver batches of 250 units, how is the total variable cost influenced?
(iii) If the supplier relaxes their order size requirements, as the company has limited storage space it can stock a maximum of 100 units at any time. What would be the optimal ordering policy and associated costs? (15 marks)
3. (b) Consider the following aggregate planning problem for four months:
[Table: Regular time | Overtime | Subcontracting; Production capacity/month | 900 units | 300 units | 200 units; Production cost/unit | ₹6/- | ₹8/- | ₹9/-]
The forecasted demand for the next four months is 1300, 1400, 1225 and 1475 units respectively. Shortages are not permitted. The initial inventory is 50 units, and the carrying cost is ₹1.60 per unit per month.
Provide the aggregate plan for this problem. (15 marks)
3. (c) The warehouse owner of Quick Industries is considering a new computer system for accounting and inventory control. A computer vendor sent the following information about the system installation:
[Table: Activity Identification | Activity description | Immediate Predecessor | Time (Days) (Most optimistic | Most likely | Most pessimistic); A | Selection of Computer Model | - | 5 | 7 | 9; B | Input/output System Design | A | 6 | 8 | 16; C | Monitoring System Design | A | 5 | 9 | 13; D | Computer Hardware Assembly | B | 16 | 21 | 26; E | Development of main Programs | B | 11 | 19 | 27; F | Input/output routines development | C | 9 | 10 | 17; G | Database Creation | E | 5 | 9 | 13; H | Installation of the system | D, F | 2 | 3 | 4; I | Testing and Implementation | G, H | 7 | 8 | 9]
(i) Draw the network diagram for this information. Identify the Critical Path and expected project completion time.
(ii) Calculate the probability that the project will be completed in 61 days.
(iii) When the company wants to be 95% sure that the system will be installed by a certain date, how many days prior to that should it start the work? (20 marks)
हिंदी में पढ़ें
(a) एक कंपनी में किसी वस्तु की वार्षिक मांग 1600 इकाई है जिसकी लागत प्रति इकाई ₹70/- है। वार्षिक होल्डिंग लागत व्याज शुल्क के रूप में 18%, बीमा के लिए 1%, इकाई लागत के अप्रचलन के लिए 1.5% भत्ता, भवन उपरिव्यय ₹2.50, क्षति हानि के लिए ₹3.40 और विविध लागत ₹7.0 है। प्रत्येक आर्डर देने में कंपनी को ₹100/- का खर्च आता है।
(i) आर्थिक आदेश मात्रा (ई ओ क्यू) की गणना कीजिए और स्टॉकिंग इकाइयों की कुल लागत गणना कीजिए।
(ii) यदि वस्तुओं का आपूर्तिकर्ता 250 इकाइयों के खेप (बैच) में ही वितरण करता है तो कुल परिवर्तनीय लागत कैसे प्रभावित होगी?
(iii) चूँकि कंपनी के पास सीमित संग्रह स्थान है, आपूर्तिकर्ता अपने आदेश आकार के आवश्यकताओं में ढील देने को तैयार है। अगर 100 इकाई ही किसी समय भंडार किया जा सकता है तो इष्टतम आदेश (आर्डरिंग) नीति क्या होगी और संबंधित लागत क्या होगी? (15 अंक)
3. (b) निम्नलिखित समग्र नियोजन समस्या को चार महीनों के लिए विचार कीजिए:
[टेबल: नियमित समय | अधिक समय तक | उपपट्टू करना; उत्पादन क्षमता/माह | 900 इकाई | 300 इकाई | 200 इकाई; उत्पादन लागत/इकाई | ₹6/- | ₹8/- | ₹9/-]
अगले चार महीनों के लिए मांग पूर्वानुमान क्रमश: 1300, 1400, 1225 और 1475 इकाई है। किसी भी चीज की कमी की अनुमति नहीं है। आरंभिक माल 50 इकाई है और वहन करने की लागत ₹1.60 प्रति इकाई प्रति माह है।
इस समस्या हेतु समग्र योजना उपलब्ध कराइए। (15 अंक)
3. (c) Quick Industries के गोदाम मालिक मालसूची नियंत्रण और लेखांकन के लिए एक न्यू कंप्यूटर सिस्टम पर विचार कर रहा है। एक कंप्यूटर विक्रेता ने सिस्टम स्थापित करने के लिए निम्नलिखित जानकारी दी है:
[टेबल: गतिविधि पहचान | गतिविधि विवरण | तत्काल पूर्ववर्ती | समय (दिनों में) (सबसे अधिक आशावादी | सबसे अधिक सम्भावना | सबसे निराशावादी); A | कंप्यूटर मॉडल का चयन | - | 5 | 7 | 9; B | इनपुट/आउटपुट सिस्टम वास्तुकला | A | 6 | 8 | 16; C | सिस्टम वास्तुकला की निगरानी | A | 5 | 9 | 13; D | कंप्यूटर के भौतिक भाग को जोड़ना | B | 16 | 21 | 26; E | मैन प्रोग्राम का विकास | B | 11 | 19 | 27; F | इनपुट/आउटपुट का व्यवस्थित विकास | C | 9 | 10 | 17; G | डेटाबेस बनाना | E | 5 | 9 | 13; H | सिस्टम की स्थापना | D, F | 2 | 3 | 4; I | परीक्षण एवं कार्यान्वयन | G, H | 7 | 8 | 9]
(i) इस जानकारी से जाल तंत्र (नेटवर्क) आरेख खींचिए। महत्वपूर्ण पथ की पहचान कीजिए और अपेक्षित परियोजना पूर्ण होने का समय बताइए।
(ii) 61 दिनों में इस परियोजना के पूरे होने की संभावना की गणना कीजिए।
(iii) जब कंपनी 95% निश्चित करना चाहती है कि सिस्टम एक निश्चित तिथि तक स्थापित कर दिया जाय, ज्ञात कीजिए कि उसे कितने दिन पूर्व, कार्य को प्रारंभ करना चाहिए? (20 अंक)
Answer approach & key points
Framework: EOQ Model, Aggregate Planning, PERT. (a) calculate: given > formula > substitution > result with units > interpretation | (b) calculate: given > formula > substitution > result with units > interpretation | (c) calculate: given > formula > substitution > result with units > interpretation Full marks: Precise calculations with correct logic and clear presentation of all constraints.
- H = ₹27.25 (percentages on ₹70 plus fixed elements); EOQ ≈ 108.37 units (~14.8 orders/yr)
- TVC at EOQ = √(2DSH) ≈ ₹2,952.96; purchase 1600×70 = ₹1,12,000; stocking total ≈ ₹1,14,952.96
- Q = 250: TVC = ₹640 + ₹3,406.25 = ₹4,046.25 → +₹1,093.29 vs EOQ
- Storage cap 100: Q* = 100 → TVC ₹2,962.50 (~₹9.54 above EOQ); 16 orders; interval ≈22.81 days
- Net requirement 5350; month-wise schedule using regular/overtime/subcontract (no shortages)
- Costs: M1 ₹8,250; M2 ₹9,600; M3 ₹8,700 (ending inventory 75); M4 ₹9,600
- Total production ₹36,150 + carrying (75×₹1.60 = ₹120) = ₹36,270
- Satisfies demands 1300/1400/1225/1475; all capacities respected
Q4 50M discuss Information systems and expert systems
4.(a) (i) "Expert Systems play a significant role in Organisations." Discuss it giving at least four benefits of Expert Systems. 10
(ii) Elaborate the different components of Expert Systems giving suitable examples. 10
(b) (i) "Information Resource Management is a strategic plan of an organisation." Elaborate. 10
(ii) What are the important components that must be considered for implementation of Information Resource Management. 5
(c) (i) Explain the fundamental role of Information Systems in business and organisations. 5
(ii) State at least eight evaluation factors for an excellent information system. 10
हिंदी में पढ़ें
4.(a) (i) "संगठन में विशेषज्ञ प्रणाली महत्त्वपूर्ण भूमिका निभाते हैं।" विशेषज्ञ प्रणाली के कम से कम चार लाभ देते हुए इस कथन की विवेचना कीजिए । 10
(ii) उपयुक्त उदाहरणों द्वारा विशेषज्ञ प्रणाली के विभिन्न अवयवों का विस्तार से व्याख्या कीजिए । 10
(b) (i) "सूचना संसाधन प्रबंधन किसी संगठन की एक रणनीतिक योजना होती है।" विस्तार से व्याख्या कीजिए। 10
(ii) सूचना संसाधन प्रबंधन के कार्यान्वयन के लिए कौन से महत्वपूर्ण अवयव हैं जिन पर विचार किया जाना चाहिए ? 5
(c) (i) संगठन और व्यवसाय में सूचना प्रणाली की मौलिक भूमिका को समझाइये। 5
(ii) उत्कृष्ट सूचना प्रणाली के कम से कम आठ मूल्यांकन कारकों का उल्लेख कीजिए। 10
Answer approach & key points
Framework: null. (a(i)) discuss: intro > 3-4 dimensions > example > balanced close | (a(ii)) describe: define > structure or process in order > labelled diagram > significance | (b(i)) explain: definition/context > points in order > small example > short close | (b(ii)) enumerate: list the items in order > one line each > no commentary | (c(i)) explain: definition/context > points in order > small example > short close | (c(ii)) enumerate: list the items in order > one line each > no commentary Full marks: Comprehensive, well-structured answers with specific examples, frameworks, and balanced analysis.
- ES defined; four benefits (expertise preservation, 24×7 availability, consistency, training support)
- Benefits applied to organisational context
- Limitations noted (narrow domain, costly knowledge acquisition, brittleness); applications (loan appraisal, fault diagnosis, triage)
- Components: knowledge base, inference engine, user interface, explanation facility, knowledge acquisition subsystem
- Function of each explained with examples (credit scoring, MYCIN, etc.)
- Interaction/process flow shown (input → engine → conclusion + explanation)
- Suitable examples for each